| Previous
Downtime |
| Date |
Time |
Event |
| 3/28/06
- 3/29/06 |
4:00pm
- 10:30am |
Lebanon
area was receiving an "all circuits are busy" message
when dialing into JOBE. Sprint was experiencing a translation
problem which they were unable to resolve until Wednesday
morning. |
| 11/20/02 |
12:30
- 8.35 am |
Richland
Access was down from 12:30 am November 20, 2002 until 8:30
am November 20, 2002.
Downtime was due to the Sprint Circuit being down. The trouble
was reported and Sprint is working to resolve the issue as
to why this circuit fails. |
| 11/14/02 |
3:10
- 3:50 pm |
Richland
Area, A Sprint circuit went down. |
| 11/13/02 |
8:40
- 9:25 am |
Richland
Area, A Sprint circuit went down. |
| 11/7/02 |
2:45-3:45
pm |
Richland
Area, A Sprint circuit went down between Richland and Rolla. |
10/19/02
-
10/22/02 |
Sun
- Tues 10:30 am |
Wireless
Customers Only, due to equipment problems access was intermittent.
Hub replaced. |
| 10/10/02 |
8:30
- 10:30 pm |
System
suffered a slowdown due to loss of one of three Sprint T-1
backbones going down. |
| 10/1/02 |
4:55
- 5:55 pm |
Intermitent
Sprint outage restricted access to 'some' sites. As an example
while some could access usatoday.com, they could not access
cnn.com. |
| 9/22/02 |
5:04
am to 6:39 am |
Sprint
Internet Circuit |
| 8/26/02 |
10:00
am - 5:00 pm |
The
Sprint circuit out of Richland was down. The circuit was repaired
by Sprint and we are continuing to monitor it. |
| 5/12/02 |
5:30
- 7:30 pm |
Lebanon
service down due to storm |
| 5/7/02 |
5:30
am - 11:20 am |
Equipment
Failure in Crocker |
| 4/9/02 |
9:30
- 10:00 pm |
Sprint
had a nationwide outage. |
| 3/27/02 |
2:15
- 3:45 pm |
Lebanon
Fiber down (Sho-Me) |
| 2/13/02 |
3:15
- 7:45 pm |
Problem
with slow response on the Internet. Sprint inadvertently gave
away one of our backbone circuits reducing our Internet connection
by 33%. On behalf of Sprint, JOBE apologizes. |
| 1/25/02 |
3:30
- 5:45pm |
Iberia,
Alltel circuit down preventing customers from connecting to
the Internet. |
| As
of 1/17/02 |
Richland
error |
Situation
where transfer rates were slow. Sprint and Jobe worked together
to resolve the issue. Now working properly. |
| 11/12/01
- 11/13/01 |
11:30
am until 4:00 pm |
Hardware
failure in mail server. Customers unable to check mail or
display JOBE homepage but able to surf to other sites. |
| 11/7/01 |
9:00
am - 9:10 am |
City
upgrading power poles, power outage occurs. |
| 11/6/01 |
6:25
pm - 7:30 pm |
Server
was not able to verify passwords. |
| 10/04/01 |
9
pm - 10:30 pm |
Sprint
fiberoptic line down, may have affected server Lebanon, Rolla,
Newburg and Richland. |
| 9/17/01 |
9:15
- 10:05 am |
Alltel
circuit down. |
| 9/15/01 |
3:00
- 3:45 pm |
Localized
power outage affecting Bailey's TV in Lebanon which
in turn affected JOBE service. |
| 9/6/01 |
3:15
- 4:50 pm |
Alltel
lines down, affecting Dixon, Crocker and Iberia |
| 7/29/01 |
2:30
- 5:00pm |
Due
to hardware failure, the server had to be maintained.
Would not verify passwords. |
| 07/26/01 |
12:00
- 7:00 am |
The
Jobe mail server was down. Although customers could log on
and surf to other sites, all sites hosted by JOBE were unavailable
and mail was undeliverable. |
07/18/01
07/19/01 |
9:00-11:30
pm
4:45-6:30 am |
The
Jobe server had a problem verifying passwords.
|
| 07/12/01 |
1:30-3:45
pm |
Alltell
circuit down in Dixon. |
| 06/21/01 |
7:30-8:45
am |
Richland
Circuit down due to power loss
caused by the storm. |
| 03/09/01 |
12am
- 9 am |
Dixon,
Iberia and Crocker was experienceing router problems making
it difficult for users to surf. |
| 01.09.01 |
4:00
- 5:30 pm
|
Sprint
Circuit down and repaired - did not allow surfing. |
| 10.26.00 |
Lebanon
8:45 - 10:45 |
Fiber
optic link down between Lebanon and St. Robert |
| 10.02.00 |
Rolla
and Lebanon
5:30 pm - 7 pm
Local
5:30 pm - 7:30 pm |
Power
outage throughout most of St. Robert. |
| 9.25.00 |
1
am - 10 am |
Circuit
from the Cisco router failed. Customers able to log
in but not surf. |
| 6.5.00 |
Throughout
the Day |
Sprint
had a problem. This time it was called a "latency" problem
which meant you could surf but sites took a long time
to download. |
| 6.4.00 |
4:20
PM- 12:00 PM |
A
Sprint circuit was down, possibly due to a loss of electricity
in parts of St. Robert. |
| 4.28.00 |
|
Upgraded
backbone from single T1 service to multi-link T1 with
2 links, effectively doubling the capacity and eliminating
downtime. |
| 4.21.00
- 5.4.00 |
|
Switched
over to newer high speed modem pool (Alcatel 1000).
|
| 3.7.00
- 3.8.00 |
Various
times throughout these two days |
Sprint
had intermittent problems with the
T-1 backbone. It was resolved by late afternoon
Wednesday. |
| 2.24.00 |
5:50
PM - after midnight |
Continued
problems with the Sprint backbone. Sprint technicians
worked on it until the early morning hours. |
| 2.24.00 |
2:08
PM - 2:25 PM |
Problem
with the Sprint backbone. |
| 2.16.00 |
1:30
PM - 4:30 PM |
The
Rolla backbone connection failed due to an outage at
Fidelity Communications. |